Files
tailscale/.github/workflows/natlab-basic.yml
T
Claus Lensbøl bb47ea2c6b tstest/natlab/vmtest: start migrating old natlab tests to vmtest (#19727)
Instead of having two entry points for running natlab tests, start
converting the connectivity tests to use the vmtest framework.

Grid and pair tests have yet to be moved over.

Updates #13038

Signed-off-by: Claus Lensbøl <claus@tailscale.com>
2026-05-13 16:44:53 -04:00

46 lines
1.5 KiB
YAML

# Run a single natlab smoke test on every PR. The full natlab suite
# is opt-in and lives in .github/workflows/natlab-test.yml.
# See https://github.com/tailscale/tailscale/issues/13038
name: "natlab-basic"
concurrency:
group: ${{ github.workflow }}-${{ github.head_ref || github.run_id }}
cancel-in-progress: true
on:
push:
branches:
- "main"
- "release-branch/*"
pull_request:
# all PRs on all branches
merge_group:
branches:
- "main"
jobs:
EasyEasy:
runs-on: ubuntu-latest
steps:
- name: Check out code
uses: actions/checkout@de0fac2e4500dabe0009e67214ff5f5447ce83dd # v6.0.2
- name: Enable KVM
run: |
echo 'KERNEL=="kvm", GROUP="kvm", MODE="0666", OPTIONS+="static_node=kvm"' | sudo tee /etc/udev/rules.d/99-kvm4all.rules
sudo udevadm control --reload-rules
sudo udevadm trigger --name-match=kvm
- name: Install qemu
run: |
sudo rm -f /var/lib/man-db/auto-update
sudo apt-get -y update
sudo apt-get -y remove man-db
sudo apt-get install -y qemu-system-x86 qemu-utils
- name: Build VM image
# The test will build this if missing, but we do it explicitly
# to avoid cutting into the go test -timeout budget, and to
# fail earlier with a clearer error if the image build breaks.
run: |
make -C gokrazy natlab
- name: Run natlab integration tests
run: |
./tool/go test -v -run=^TestEasyEasy$ -timeout=3m -count=1 ./tstest/natlab/vmtest --run-vm-tests